Everything about Dounreay totally explained
Dounreay (
Ordnance Survey ) is the name of a now ruinous
castle on the north
coast of
Caithness, in the
Highland area of
Scotland. The castle, however, is within grounds used by the
United Kingdom Atomic Energy Authority (
Dounreay Nuclear Power Development Establishment) and the
Ministry of Defence (
Vulcan Naval Reactor Test Establishment). It is the site of five
nuclear reactors, three owned and operated by the UKAEA and two by the Ministry of Defence.
The nuclear power establishment was built on the site of a
World War II airfield, called
HMS Tern (II). The airfield was transferred to the
Admiralty by
RAF Coastal Command in 1944, as a satellite of
HMS Tern at
Twatt in
Orkney. It never saw any action during the war and was placed into
care and maintenance in 1949.
Dounreay is near the
A836 road, about 9
miles (14
km) west of the town of
Thurso, which grew rapidly when the research establishment was developed during the mid 20th century. The establishment has remained a major element in the
economy of Thurso and Caithness since that period.
Etymology
According to one story the name
Dounreay came about after a local with a strong accent tried to pronounce
Down Reay to a map maker (Down Reay being
down the road
from the village of
Reay, with the rural and part-time
post office at the entrance to the reactor establishment having had the correct name,
Down Reay, above its door).
Robert Gordon's map of Caithness, 1642, uses
Dounrae as the name of the castle.
Watson's
The Celtic Place-names of Scotland gives the origin as
Dúnrath, and suggests that it may be a reference to a
broch. This is the commonly accepted toponymy.
Dounreay Nuclear Power Development Establishment
Dounreay Nuclear Power Development Establishment was established in 1955 primarily to pursue the UK Government policy of developing
fast breeder reactor (FBR) technology. The site was operated by the
United Kingdom Atomic Energy Authority (UKAEA). Three
nuclear reactors were built there by the UKAEA, two of them FBRs plus a thermal research reactor used to test materials for the program, and also fabrication and reprocessing facilities for the materials test rigs and for fuel for the FBRs.
DMTR
The first of the Dounreay reactors to achieve criticality was the
Dounreay Materials Test Reactor (
DMTR), in May 1958. This reactor was used to test the performance of materials under intense neutron irradiation, particularly those intended for fuel cladding and other structural uses in a
fast neutron reactor core. Test pieces were encased in uranium-bearing alloy to increase the already high neutron flux of the
DIDO class reactor, and then chemically stripped of this coating after irradiation. DMTR was closed in 1969, when materials testing work was consolidated at
Harwell Laboratory.
-239 Core
|-
|2||
|-
|3||-235
|-
|4||Primary Coolant Loop
|-
|5||Secondary Coolant Loop
|-
|6||Secondary Circulator
|-
|7||Secondary Heat Exchanger
|-
|8||Primary Heat Exchanger
|-
|9||Primary NaK Circulator
|-
|10|| Neutron Shield
|-
|11||Radiation Shield
|}]]
DFR
The second reactor to achieve criticality (although the first to commence construction) was the
Dounreay Fast Reactor (
DFR), which came on-line in November 1959, producing an electrical output of 14
MWe. This power was exported to the
National Grid from 14 October 1962 until the reactor was taken offline for decommissioning in 1977. During its operational lifespan, DFR produced over 600 million kWh of electricity.
DFR was a loop-type
FBR cooled by primary and secondary
NaK circuits, with 24 primary coolant loops. The reactor core was fuelled initially with uranium metal fuel stabilized with
molybdenum and clad in
niobium. The core was later used to test oxide fuels for PFR and provide experimental space to support overseas fast reactor fuel and materials development programmes.
PFR
The third and final UKAEA-operated reactor to be built on the Dounreay site was the
Prototype Fast Reactor (
PFR), which achieved criticality in 1974 and began supplying National Grid power in January 1975. The output of PFR was 250 MWe. The reactor was taken offline in 1994, marking the end of nuclear power generation at the site. PFR was a pool-type
FBR, cooled by liquid
sodium and fueled with
MOX.
Subsequent activity
Since the reactors have all been shut down, care and maintenance of old plant and decommissioning activities have meant that Dounreay has still retained a large work-force. Commercial reprocessing of spent nuclear fuel and waste was stopped by the UK government in 1998 although some waste is still accepted from other nuclear facilities in special circumstances.
Nuclear Decommissioning Authority ownership
On
1 April 2005 the
Nuclear Decommissioning Authority (NDA) became the owner of the site, with the UKAEA remaining as operator. Decommissioning of Dounreay is planned to bring the site to an interim care and surveillance state by 2036, and as a
brownfield site by 2336, at a total cost of
£2.9 billion
(External Link
).
Apart from decommissioning the reactors, reprocessing plant, and associated facilities, there are five main environmental issues to be dealt with:
- A 65-metre deep shaft used for intermediate level nuclear waste disposal is contaminating some groundwater, and is threatened by coastal erosion in about 300 years time. The shaft was never designed as a waste depository, but was used as such on a very ad-hoc and poorly monitored basis, without reliable waste disposal records being kept. In origin it's a relic of a process by which a waste-discharge pipe was constructed. The pipe was designed to discharge waste into the sea. Historic use of the shaft as a waste depository has resulted in one hydrogen gas explosion (External Link
) caused by sodium and potassium wastes reacting with water. At one time it was normal for workers to fire rifles into the shaft to sink polythene bags floating on water.(External Link
) There are fears that accumulated material might represent a potential critical mass
- Irradiated nuclear fuel particles on the seabed near the plant, estimated about 10,000 in number. Some are being washed ashore, including as of 2006 about 70 smaller particles on the public Sandside Bay beach and one at a popular tourist beach at Dunnet. (External Link
) The way these particles escaped the site hasn't been determined, there are several plausible possibilities. The risk to the public is considered low.
- 18,000 cubic metres of radiologically contaminated land, and 28,000 cubic metres of chemically contaminated land.
- 1,350 cubic metres of high and medium active liquors and 2,550 cubic metres of unconditioned intermediate level nuclear waste in store.
- 1,500 tonnes of sodium, 900 tonnes of this radioactively contaminated from the Prototype Fast Reactor.
Historically much of Dounreay's nuclear waste management was poor. On
18 September 2006, Norman Harrison, acting chief operating officer, predicted that more problems will be encountered from old practices at the site as the decommissioning effort continues. Some parts of the plant are being entered for the first time in 50 years.
(External Link
)
In 2007 UKAEA pleaded guilty to four charges under the
Radioactive Substances Act 1960 relating to activities between 1963 and 1984, one of disposing of radioactive waste at a landfill site at the plant between 1963 and 1975, and three of allowing nuclear fuel particles to be released into the sea,
(External Link
)(External Link
) resulting in a fine £140,000.
(External Link
)
Vulcan NRTE
The Vulcan Naval Reactor Test Establishment (NRTE) is a Ministry of Defence (MoD) establishment housing the prototype nuclear propulsion plants of the type operated by the Royal Navy in its submarine fleet.
For over 40 years Vulcan has been the cornerstone of the Royal Navy's nuclear propulsion program, testing and proving the operation of four generations of reactor core and currently testing its fifth. Its reactors have significantly led the operational submarine plants in terms of operation hours, proving systems, procedures and safety.
Rolls-Royce, who design and procure all the reactor plants for the Royal Navy from their Derby headquarters, operate Vulcan on the behalf of the MoD and employ around 280 staff there, lead by a small team of staff from the Royal Navy.
The cost of decommissioning NRTE facilities when they become redundant, including
nuclear waste disposal, was estimated at £2.1 billion in
2005.
(External Link
)
Dounreay Submarine Prototype 1 (DSMP1)
The first reactor,
PWR1, is known as Dounreay Submarine Prototype 1 (DSMP1). The reactor plant was recognised by the Royal Navy as one of Her Majesty's Submarines (HMS) and was commissioned as HMS Vulcan in 1963, though it didn't go critical until 1965. HMS Vulcan is a Rolls-Royce PWR 1 reactor plant and tested Cores A, B and Z before being shutdown in 1984. In 1987 the plant was re-commissioned as LAIRD (Loss of Coolant Accident Investigation Rig Dounreay) a non-nuclear test rig, the only one of its kind in the world. LAIRD trials simulated loss of coolant accidents to prove the effectiveness of systems designed to protect the reactor in loss of coolant accident.The plant was decommissioned in 1992 after more than 250 separate trials and a total of 27 years successful operation.
Shore Test Facility (STF)
The second reactor,
PWR2, is housed in the Shore Test Facility (STF), was commissioned in 1987, and went critical with Core G the same year. The plant was shut down in 1996, and work began to refit the plant with the current core, Core H, in February 1997. This work was completed in 2000 and after two years of safety justification the plant finally went critical in 2002 and is still critical today. Vulcan Trials Operation and Maintenance (VTOM) (the programme under which Core H is tested) is scheduled to be complete in 2014 and the reactor will be de-fuelled and examined. The site would then be decommissioned in conjunction with facilities at neighbouring UKAEA Dounreay.
Further Information
Get more info on 'Dounreay'.
|
External Link Exchanges
Do you know how hard it is to get a link from a large encyclopaedia? Well we're different and will prove it. To get a link from us just add the following HTML to your site on a relevant page:
<a href="http://dounreay.totallyexplained.com">Dounreay Totally Explained</a>
Then simply click through this link from your web page. Our crawlers will verify your link, extract the title of your web page and instantly add a link back to it. If you like you can remove the words Totally Explained and embed the link in article text.
As long as your link remains in place, we'll keep our link to you right here. Please play fair - our crawlers are watching. Your site must be closely related to this one's topic. Any kind of spamming, dubious practises or removing the link will result in your link from us being dropped and, potentially, your whole site being banned. |